A working Kasarani: my plan for the next five years
Five priorities, each with a number attached
In brief
Water that reaches every village, a clinic open when people are free, bursaries that reach the children they were meant for, working equipment at the vocational centre, and light on the footpaths.
07Why the ward floods
Problem
The main drain was built for a smaller ward and has not been cleared since 2018. Every long rains, three estates flood and the market road becomes impassable for a week.
Promise
The drain cleared and repaired before the next long rains, and the market road kept open.
Plan
Clear the main drain in the dry season, repair the two collapsed sections, and put the desilting on a published annual schedule.
Result
A drain that clears and a market road that stays open through the rains.
What people are saying
0 commentsNo comments yet. Say what you think of this promise.